WARNING!
This post contains some seriously white legs.
Making progress on my Loopy Academy projects this past week. I started my Clog-n-Soc last week. The felting is done, it took 3 trips through my front-load washer to loose almost all of the stitch definition. They still feel big around the foot but my guess after they are washed a couple more times they will tighten up. First picture is before felting and the second is after. The only thing left to knit on them is about 5 - 6 inches of sock.
This morning I started Sleeves for my striped project. I have wanted to knit Sleeves for along time, I think this sweater will be very well used now that we are entering the A/C season.
I finished my socks last week for the slipped-stitch project - Dalekanium. The pattern is easy to knit up but the socks are still a little bigger than I like with even going down a size.
Take a minute and stop over at Patchwork Times and see what others have on their Needle.
Mary